Rubber Surfacing Goes Over The Concrete That Is Already There
Rubber surfacing is troweled straight onto the slab that exists, so the concrete, asphalt, pavers or wood already there does not go anywhere; it becomes the base. Nothing is demolished, no bin lands in the driveway, and there is no fresh concrete to wait on. On site, rubber granules get blended with a polyurethane binder, spread by hand to whatever depth the surface calls for, and left alone to cure.
In Oshawa that matters because most of the slabs we see were poured for the GM-era bungalows south of King Street or the split-levels of Eastdale and Donevan, and they are worn rather than broken. Rubber surfacing bridges hairline cracks, hides pitting and gives the old slab a fresh, seamless top that drains and grips.
Pool Decks In Oshawa Get Slick Where The Water Lands
Rubber surfacing turns a slick pool deck into a surface that grips wet feet, and we pour it right over the concrete or pavers already around the pool. The backyard pools of Pinecrest, Northglen and the ravine lots of McLaughlin mostly sit on broom-finished concrete that has been worn smooth by twenty summers of chlorinated water and sunscreen.
The lake-edge winter makes it worse. Water sits in the low spots of the deck, freezes, thaws, and freezes again through a January that hovers around zero, and the surface flakes. Pool deck rubber surfacing is porous, so the water goes through it, and it is soft enough that a slip is a bruise instead of a broken wrist.
Garage Floors South Of The 401 Are Pitted By Salt Brine
Rubber surfacing puts a dense black or charcoal top over a garage floor that salt has pitted, and brine, shovels and tires leave it alone. The 1950s and 1960s garage slabs in Lakeview, Vanier and Centennial were poured thin over the old lakebed clay, and every winter the car drips brine onto them, where it sinks in, turns to ice and blows the surface apart.
In Oshawa a garage floor rubber surfacing job usually fits in a single day. Grinding, filling the pits, priming and then troweling the rubber on at roughly half an inch is the whole sequence. It drains, it does not dust, and it is far quieter than a bare slab when a tool hits it.
A Playground Surface Is Sized By The Fall It Has To Catch
Playground rubber surfacing is a deep pour, because how far a child can drop from the equipment dictates the thickness, and we build that depth in two layers rather than guessing. Black SBR goes down first as the cushion, then a coloured EPDM cap is troweled across it, soft where it counts and bright where the kids see it.
Daycares, church yards and school boards across Oshawa and Clarington have watched loose mulch scatter out from under the swings by October and leave bare dirt where children land. Playground rubber surfacing does not move, does not need topping up and drains after a storm off the lake.
Front Steps And Walkways In Oshawa Ice Over In The Shade
Rubber surfacing gives a shaded front step a surface that grips even when the rest of the walk is glazed, and we pour it over the concrete, brick or wood step that is there now. On a north-facing porch in O'Neill or a ravine lot in Samac the sun never reaches the steps in January, so meltwater refreezes on them every afternoon.
That meltwater drops down through the rubber instead of lying on top of it, and since the surface is warmer and rougher than concrete, ice cannot get the same grip on it. Step and walkway rubber surfacing can be run up the risers as well as across the treads, so the nosing is protected too.
Patios On Oshawa Clay Heave And Crack At The Joints
Rubber surfacing covers a heaved patio in one seamless layer, so the joints that opened up over the years disappear. South of King Street the ground is silty clay left by an old lake, and it hangs onto water. Freeze that water and the slab rises a fraction of an inch; thaw it and the slab settles back, and each winter every joint and control cut ends up a little wider.
Because rubber surfacing flexes, it rides that small seasonal movement without splitting. A crack that is still working gets cut open and filled ahead of the pour, because rubber over a live crack hides it without holding it. Hairline and static cracks are simply spanned by the rubber surfacing.
Gym Floors Are Loud, Hard And Slippery When They Are Bare Concrete
Rubber surfacing turns a bare basement or commercial gym floor into a surface that absorbs the drop of a dumbbell and grips a sweaty shoe. We pour it in black SBR for a plain rubber gym floor or with an EPDM fleck for colour.
Home gyms in the finished basements of Taunton and Kedron, studio spaces near Ontario Tech and Durham College and the fitness rooms in condo buildings along Simcoe Street all have the same problem, which is a concrete floor that is cold, hard and noisy. Gym and fitness rubber surfacing goes down at three-eighths of an inch, rising to three-quarters where the free weights land, and because it is one seamless piece there is no mat edge anywhere to curl.
Barn Aisles And Loading Docks Need A Surface That Grips Under Weight
Rubber surfacing holds up under a horse in shoes, a pallet jack or a delivery truck, and we pour it in the wash stalls and aisles of horse farms toward Columbus and Raglan as readily as on a store entrance on King Street. A horse on wet concrete is a horse waiting to slip, and a rubber aisle is quieter, warmer and easier on legs.
For a business, commercial and equestrian rubber surfacing goes on entrance ramps, walkways, rooftop terraces, seniors' residence courtyards and daycare yards, wherever the people walking on it deserve a softer, grippier surface than the concrete they have now.
Rubber Surfacing Poured Over Sealer Or Paint Will Peel
Rubber surfacing will only bond to bare, clean material, so we grind off old sealer, paint and cure compound before priming. A slab that looks clean can still be coated, and rubber poured over a coating comes up in sheets within a year or two.
The same is true of a damp slab. On the old lakebed south of the 401 the water table sits high, and a garage floor that feels dry at breakfast can be wicking moisture up from below by afternoon. We meter the slab for it, and the primer waits until the reading says dry.
The Binder Decides Whether A Light Colour Yellows In The Sun
Rubber surfacing is held together by a polyurethane binder, and that binder comes in two kinds, aromatic and aliphatic. Aromatic costs less and does the job on a dark garage floor or a shaded walkway. In full sun it slowly ambers, so a light grey or tan pool deck can go yellow at the edges over a few summers.
We quote an aliphatic binder on sun-exposed light colours so the surface stays the colour you picked. The quote names which binder is included, because the difference in price is real and you should know what you are paying for.
EPDM And SBR Are The Two Granules In Every Rubber Surfacing Quote
Every rubber surfacing quote we write says which of the two granules goes in which layer. Wherever colour shows, the top is EPDM: a virgin rubber, dyed through the whole granule, that keeps its shade in the sun. Wherever black will do, or under a coloured cap as the cushion, it is SBR, which comes from shredded tires and costs less while giving more bounce.
A pool deck in Windfields is usually all EPDM at about three-eighths of an inch. A playground is SBR to depth with an EPDM cap. A garage in Vanier is often plain SBR. The mix changes the price, which is why the quote spells it out.
Rubber Surfacing In Oshawa Is A Late April To October Job
Rubber surfacing wants a slab sitting at about 10 degrees with the temperature climbing, a surface that is dry, and a forecast with no rain until the cure is done, which in Oshawa means a season from late April until the lake starts throwing cold rain in late October. The north end above Taunton Road starts a week or two later than the lakeshore and finishes a little sooner.
We book the spring quickly, so a site visit over the winter gets the job on the calendar early. One or two days finishes most home jobs, with feet on the surface the following morning.